Jul 31, 2008

Dredging and dumping at Jurong and at Labrador

SAND MINING AT AREA 1
AND DUMPING AT (i) JURONG ISLAND LNG PROJECT
AND (ii)
PASIR PANJANG TERMINAL PROJECT WORKING AREAS
from PORT MARINE NOTICE, NO. 140 OF 2008 dated 31 Jul 2008

This is a revision of Port Marine Notice No 106 of 2008.

The working area at PPT has been revised and working period extended.

With effect from 1 Aug 08 to 31 Jan 09

DREDGING AREA: Area 1, Eastern part of Singapore (wildfilms note: no map included of this area in the Port Notice)

DUMPING AREA (Jurong Island Project – Working Area A & B)DUMPING AREA (Pasir Panjang Terminal Project – Working Area 6)
24 hours daily including Sundays and Public Holidays.

The reclamation works will involve dredging by Trailer-Suction-Hopper-Dredger (TSHD) at Area 1.

Area 1 extends from the Singapore Port Limit into the westbound lane of the Traffic Separation Scheme (TSS) within the Singapore Strait.

All dredged materials will be dumped at Jurong Island project (see Working Area A and B of plan Attachment-1) and Jurong Island LNG project (see Working Area C of plan Attachment-1) and Pasir Panjang Terminal project (See Working Area 6 of plan Attachment-2)

Further enquiries relating to the project can be directed to the following Project Co-ordinators:

Jurong Island project and Jurong Island LNG project: Mr. A. Muhaimin at Tel No: 98178572, email: muhaimin@pkdbh.com.sg; and

Pasir Panjang Terminal project: Mr. Y. Abe at Tel No: 9664 8810, email: y.abe@mypenta.net .

Jul 25, 2008

Massive dredging off Cyrene Reef begins

DREDGING WORKS FROM JURONG ISLAND TO PULAU ULAR
from PORT MARINE NOTICE NO. 139 of 2008 dated 23 Jul 2008

With effect from 30 Jul 08 to 30 Nov 08, at Selat Pandan, Sinki Fairway and West Keppel Fairway, 24 hours daily, including Sundays and Public Holidays.Dredging works will be carried out by the grab dredger “Pandora” within the sectors as indicated in the chartlet. The grab dredger will be held in position by a 4-point anchor mooring system within the working area. The anchors will be marked by marker buoys. The safety working zone is a circular area of 200-metre radius centred at the dredger. A safety boat will be deployed in the immediate vicinity of the working area to warn other craft of the project work.

Further enquiries relating to the project can be directed to Mr P Bogers, the project manager, at Tel No: 9139 6094 or email bog@vanoord.comwildfilms note: besides this dredging work, the massive reclamation project at Pasir Panjang Port is also near Cyrene Reef.

Marine construction off Labrador continues

MARINE SOIL INVESTIGATION AT PASIR PANJANG TERMINAL PHASES 3 AND 4
from PORT MARINE NOTICE NO. 138 of 2008 dated 23 Jul 2008

With effect from 26 Jul 08 to 19 Sep 08 at West Keppel Fairway, 24 hours daily, including Sundays and Public Holidays.
Soil investigation works will be carried out by means of marine boring using jack-up barges. The tug boat will be used for the shifting of the jack-up barges. There are no anchors required for the jack-up barges. The safety zone is a circular area of
30-metre radius centred at the locations of the jack-up barges. A safety boat will be deployed to warn other vessels to keep clear of the barges for the whole duration of the works.

Further enquiries relating to the project can be directed to Mr Y Abe, the project co-ordinator, at Tel: 9664 8810, email: y.abe@mypenta.net.

wildfilms note: this is a continuation of the massive reclamation project to develop Pasir Panjang port.

Jul 17, 2008

Massive reclamation at Labrador continues

RECLAMATION AT PASIR PANJANG TERMINAL AND PASIR PANJANG WHARVES
from PORT MARINE NOTICE NO. 134 of 2008 dated 16 Jul 2008

This is a revision of Port Marine Notice No.117 of 2008. The working area has been revised and working period extended.

With effect from 19 Jul 08 to 18 Jan 09, Location : In the vicinity of Pasir Panjang Terminal and Pasir Panjang Wharves, within a working area bounded by the following co-ordinates (see attached plan)24 hours daily including Sundays and Public Holidays. Works will include reclamation, dredging, soil investigation, caisson construction, demolition of PW 1 and PW 2 and removal of submarine cables and pipelines. Soil investigation works will be carried out by jack-up barges attended to by tug boats. Safety boats will be deployed in the vicinity of the work area to warn other craft and vessels of the project works.

Further general enquiries can be directed to Mr Y Abe, the project coordinator, at Tel: 9664 8810, email: y.abe@mypenta.net.

wildfilms note: This is the work site in relation to Cyrene Reef (coloured yellow).See also post on recent visit to Labrador.

Jul 8, 2008

Rock filling near Labrador Nature Reserve

A) ROCK-FILLING OPERATIONS IN WEST KEPPEL FAIRWAY – SSD 7
B) TEMPORARY HOLDING AREA IN WORKING AREA “A” (OFF LABRADOR PARK)
from PORT MARINE NOTICE No. 130 of 2008 dated 7 Jul 2008

This is a revision of Port Marine Notice No 115 of 2008. The working area has been revised and working period extended.

With effect from 15 Jul 08 to 15 Sep 08, at West Keppel Fairway and approaches to Cruise Bay.

Rock-filling works will be carried out 24 hours daily, including Sundays and public holidays, within the shaded areas of SSD-7 (bounded by Points A, B, C, RF-4 and RF-5).

Working area “A”, within the shaded area of “A” (bounded by Point RF1 to Point RF8) in the vicinity of Labrador Park, has been identified as the temporary holding area for the rock-filling works.

Rock-filling Works

Rock-filling work will be carried out by tremie barge at Working Area “SSD-7”. There will be only one (1) barge carrying out rock-filling works in the working Area “SSD-7”. Tremie barge will be held in position by 4-point anchor mooring system. A safety working zone of 200-metre radius is centred at the tremie barge. Safety boats will be stationed in the immediate vicinity to warn other craft of the project work. Emergency safety tug will be stationed at all times to assist during emergency. The tremie barge will be required to shift to Working area ‘A’ where necessary.

Further enquiries relating to this operation can be directed to Mr Emir Himzari, the project co-ordinator at Tel. 9125 5998, e-mail: emir@eastmarine.com.sg.

wildfilms note: This is a continuation of the process of dumping rocks on the submarine cable to Pulau Bukom.

This is the current working area.
The working area reported in May 08.
The working area reported in Apr 08.
The working area has moved away from Cyrene Reef ...


Towards Labrador Nature Reserve (MPA should stop calling it Labrador Park). This area is also just off Sentosa's natural shores at Tanjung Rimau.

The rockfilling might seen to be near completion, but all is not calm for Labrador. There is massive sand dumping going on in the same area at the same time ...

Jul 3, 2008

Oil rig work site opposite Semakau's natural shores

OIL RIG “ESSAR WILDCAT” AT THE RAFFLES RESERVED ANCHORAGE
from PORT MARINE NOTICE NO. 129 of 2008 dated 2 Jul 2008

With effect from 6 Jul 08 to 21 Aug 08 at West Jurong Anchorage, 24 hours daily including Sundays and Public Holidays
Off-loading and loading of drilling equipment and maintenance works will be carried out onboard the rig. The work barges will be used for the transportation of the equipment to the shore facility.

Safety boats will be in attendance during the entire stay of the rig at the anchorage.

Further general enquiries relating to the project can be directed to Mr Jimmy Nicol, the project manager, at Tel No: 91188208.

wildfilms note: This area is just opposite the natural shores of Pulau Semakau where public intertidal walks are conducted and where the coral nursery is located. In addition, there was an earlier notice of construction of a fish farm in this area.
Links to more

Update: here's a view of the oil rig taken on 7 Jul 08 during our trip to Pulau Hantu.

The oil rig taken from Pulau Hantu.
Taken on the way home with indications of the locations of Pulau Semakau, Raffles Lighthouse (RLH) and Pulau Senang. Raffles Lighthouse and the Live Firing Islands of Sudong, Pawai and Senang have some of the last untouched reefs in Singapore. While Pulau Semakau has good natural shores. Let's hope this massive activity does not impact these nearby reefs.
A closer look at the oil rig.
Here's a photo of the oil rig taken on Pulau Semakau on 3 Aug 08

The work period was extended to September in a follow up notice. More on the wild shores of singapore blog.

Jun 26, 2008

The sea bottom off Pulau Sudong is being measured

ENVIRONMENTAL SAMPLING AND ACOUSTIC EXPERIMENTS AT THE SELAT PAUH ANCHORAGE
from PORT MARINE NOTICE NO. 123 of 2008 dated 24 June 2008

26 Jun 2008 to 04 Jul 2008, 0800 to 1700 hours daily excluding Saturdays and Sundays at Selat Pauh Anchorage

There will be measurements of ocean water and sea-bottom properties by unmanned vehicles and surface craft. The unmanned craft will be operating in a 500m radius of the work boats. Acoustic communication tests will also be carried out in the working area. A safety boat will be in attendance during the entire period of experiment at the anchorage. Further enquiries relating to the project can be directed to Ms Regina Chan, the project coordinator, at Tel 9835 1615 or email: regina@smart.mit.edu

wildfilms note: this area is just off Pulau Hantu and the natural shores on Pulau Semakau.

This project continues in Sep 08. More on the wild shores of singapore blog.

Jun 20, 2008

Massive reclamation at Tuas and Jurong, more works off Labrador

RECLAMATION WORK AT TUAS VIEW EXTENSION
from PORT MARINE NOTICE NO. 121 OF 2008 dated 19 June 2008

This is a revision of Port Marine Notice No. 3 of 2008. The working period has been extended.

With effect from 7 July 08 to 6 January 09 at the Western part of Singapore.24 hours daily including Sundays and Public Holidays.

The reclamation works involve shore protection and other ancillary works by the crane barges. The grab dredgers will be carrying out dredging, and the trailer-hopper-suction dredgers and hopper barges will be deployed to deposit reclamation materials. The crane barges and grab dredgers will be held in position by 4-point anchor mooring. Soil investigation will be carried out by the jack-up barges periodically. Further general enquiries relating to the project can be directed to Mr T Watanabe, the construction manager, at Tel No: 9668 1523, email:t.watanabe@mypenta.net

RECLAMATION OF JURONG ISLAND PHASE 4
from PORT MARINE NOTICE NO. 120 of 2008 dated 19 June 2008

This is a revision of Port Marine Notice No. 200 of 2007. The working period has been extended.

With effect from 3 July 08 to 02 January 09 at the Western part of Singapore.24 hours daily including Sundays and Public Holidays.

The reclamation works will involve cutter suction (CS) dredgers, railer-suctionhopper (TSH) dredgers and hopper barges. Shore protection works will be carried out by crane barges and the dredging of sand-key trench by grab dredger.

Marine soil investigation works will be carried out by jack-up barge within Working Area “C”.

Further enquiries relating to the project can be directed to Mr T. Watanabe, the construction manager at Tel No: 9668 1523, email: t.watanabe@mypenta.net

MARINE SOIL INVESTIGATION AT PASIR PANJANG TERMINAL PHASES 3 AND 4
PORT MARINE NOTICE NO. 119 of 2008 dated 19 June 2008

This is a revision of Port Marine Notice No. 91 of 2008. The working period has been extended.

With effect from 20 June 08 to 19 July 08, at West Keppel Fairway.Soil investigation works will be carried out by means of marine boring using a jack-up barge. Tug boat will be used for shifting operation of the jack-up barge. There are no anchors required for the jack-up barge. However, a 30-metre radius centred at the location of the jack-up barge should work as a safety zone. A safety boat will be deployed to warn other vessels to keep clear of the barges for the whole duration of the works. Further enquiries relating to the project can be directed to Mr Y Abe, the project co-ordinator, at Tel: 9664 8810, email: y.abe@mypenta.net.

Jun 14, 2008

Reclamation starts at Sentosa, massive works continue near Labrador

RECLAMATION WORKS AT CRUISE BAY
from PORT MARINE NOTICE NO. 114 of 2008 dated 12 June 2008

With effect from 18 June 08 to 17 Nov 08, at Sentosa.Working Area “A”
The works include construction of a sea wall, piling, dredging and land reclamation within the working area. Sea wall piling, drilling and socket work will be carried out together with casting of concrete capping beam and pre-cast fasica panel installation along the sea wall. Backfilling works behind the wall will run concurrently with the seawall construction. Silt curtain will be deployed to prevent siltation. Further enquires relating to the project can be directed to Mr Chris
Kelly, the project manager, at Tel: 9118 2802, email: chris_kelly@macdow.com.au .

Working Area “B”
Area will be used as a temporary staging for the importing of aggregate and materials used for the concrete batching plant and removal of excavated fill from the basement works. A safety boat will be deployed to advise all craft to keep clear of the working area.

Further enquires relating to the project can be directed to Mr Kwan Soon Boon, the project manager, at Tel: 9150 6390, email:
sbkwan@ktcce.com.sg

wildfilms note: This is what the area looked like when we visited Sentosa last month. We also noted coral bleaching during that visit on the natural shores of Sentosa around the corner from this work site.

RECLAMATION AT PASIR PANJANG TERMINAL AND PASIR PANJANG WHARVES
from PORT MARINE NOTICE NO. 117 of 2008 dated 13 June 2008

This is a revision of Port Marine Notice No. 104 of 2008. The working area has been revised and
working period extended.

With effect from 20 June 08 to 19 Dec 08, in the vicinity of Pasir Panjang Terminal and Pasir Panjang Wharves, 24 hours daily including Sundays and Public Holidays.

Works will include reclamation, dredging, soil investigation, caisson construction, demolition of PW 1 and PW 2 and removal of submarine cables and pipelines.

Soil investigation works will be carried out by jack-up barges attended to by tug boats. Safety boats will be deployed in the vicinity of the work area to warn other craft and vessels of the project works. Further general enquiries can be directed to Mr Y Abe, the project
coordinator, at Tel: 9664 8810, email: y.abe@mypenta.net.

A) ROCK-FILLING OPERATIONS IN WEST KEPPEL FAIRWAY – SSD6
B) TEMPORARY HOLDING AREA IN WORKING AREA “A” (OFF LABRADOR PARK)
from PORT MARINE NOTICE No. 115 of 2008 dated 13 June 2008

The existing Port Marine Notice No. 108 of 2008 is superseded by this Port Marine Notice.

With effect from 21 June 2008 to 10 August 2008, at West Keppel Fairway and approaches to Cruise Bay, within working areas bounded by the following co-ordinates

Rock-filling works will be carried out 24 hours daily, including Sundays and public holidays, within the shaded areas of SSD-6 (bounded by Point D, A, B and E).

Working area “A”, within the shaded area of “A” (bounded by Point RF1 to Point RF8) in the vicinity of Labrador Park, has been identified as the temporary holding area for the rock-filling works.

Rock-filling Works
Rock-filling work will be carried out by tremie barge at Working Area “SSD-6”. There will be only one (1) barge carrying out rock-filling works in the working Area “SSD-6”. Tremie barge will be held in position by 4-point anchor mooring system. A safety working zone of 200-metre radius is centred at the tremie barge. Safety boat will be stationed in the immediate vicinity to warn other craft of the project work. Emergency safety tug will be stationed at all times to assist during emergency. The tremie barge will be required to shift to Working area ‘A’ where
necessary. Further enquiries relating to this operation can be directed to Mr Emir Himzari, the project co-ordinator at Tel. 9125 5998, e-mail: emir@eastmarine.com.sg.

May 27, 2008

Rock filling near Cyrene with holding area off Labrador Nature Reserve

A) ROCK-FILLING OPERATIONS IN WEST KEPPEL FAIRWAY – SSD5A and SSD5B
B) TEMPORARY HOLDING AREA IN WORKING AREA “A” (OFF LABRADOR PARK)
from PORT MARINE NOTICE No. 108 of 2008 26 May 2008

The existing Port Marine Notice No. 84 of 2008 is superseded by this Port Marine Notice.

With effect from 28 May 08 to 15 July 08, at West Keppel Fairway, Jong Fairway and approaches to Cruise Bay.

Rock-filling works on area SSD-5A will be carried out 24 hours daily, including Sundays, within the shaded areas of SSD-5A (bounded by Point G, I, J, K, L and H).

Rock-filling works on area SSD-5B will be carried out during daylight hours only, including Sundays, within the shaded areas of SSD-5B (bounded by Point G, F, D, E and H).

Working area “A”, within the shaded areas of “A” (bounded by Point 1 to Point 8) in the vicinity of Labrador Park, has been identified as the temporary holding area for the rock-filling works.

Rock-filling work will be carried out by the Tremie barge at Working Area “SSD-5A” and “SSD-5B”. There will be only one (1) barge carrying out rock-filling works in the working Area “SSD-5A” or “SSD-5B”. The Tremie barge will be held in position by 4-point anchor mooring system. A safety working zone of 200-metre radius is centred at the Tremie barge. Safety boats will be stationed in the immediate vicinity to warn other craft of the project work. Emergency safety tug will be stationed at all times to assist during emergency. The Tremie barge will be required to shift to Working area ‘A’ where necessary.

Further enquiries relating to this operation can be directed to Mr Emir Himzari, the project co-ordinator at Tel. 9125 5998, e-mail: emir@eastmarine.com.sg.

wildfilms note: this is the current working area ...

Compared to the last working area ...

The working area has moved away from Cyrene Reef ...


Towards Labrador Nature Reserve (MPA should stop calling it Labrador Park). This area is also just off Sentosa's natural shores at Tanjung Rimau.

Not forgetting that at the same time, there is massive sand dumping going on in the same area at the same time ...

Dredging and construction at Sungei Serangoon opposite Pulau Ubin

DREDGING AND MARINE CONSTRUCTION WORKS AT SUNGEI SERANGOON
from PORT MARINE NOTICE NO. 107 of 2008 26 May 2008

With effect from 26 May 08 to 25 Nov 08, at Sungei Serangoon, within a working area bounded by the following coordinates (see attached plan):

Dredging works will be carried out by grab dredgers. The grab dredgers will be held by 4-point anchoring system and each anchor position will be marked by a yellow buoy, Fl Y 3s.

Installation of temporary cofferdam; and construction of gate house, spillway and dam will be carried out within the working area.

Further enquiries relating to the project can be directed to Mr Mok Chin Ket, the project director, at Tel. 9628 7370, email: mokck@koon.com.sg.

May 13, 2008

Sand mining and sand dumping next to Labrador and near Cyrene Reef and Sentosa

SAND MINING AT AREA 1 AND DUMPING AT (i) JURONG ISLAND LNG PROJECT AND (ii) PASIR PANJANG TERMINAL PROJECT WORKING AREAS
from PORT MARINE NOTICE NO. 106 OF 2008 13 May 2008

The existing Port Marine Notice No. 78 of 2008 is superseded by this Port Marine Notice.

With effect from 16 May 08 to 15 Nov 08, 24 hours daily including Sundays and Public Holidays.

The reclamation works will involve dredging by Trailer-Suction-Hopper-Dredger (TSHD) at Area 1. Area 1 extends from the Singapore Port Limit into the westbound lane of the Traffic Separation Scheme (TSS) within the Singapore Strait.

All dredged materials will be dumped at Jurong Island project (See Working Area A and B of plan Attached-1) and Jurong Island LNG project (See Working Area C of plan Attached-1)
and Pasir Panjang Terminal project (See Working Area of plan Attached-2)
Further enquiries relating to the project can be directed to the following Project Co-ordinators:
Jurong Island project and Jurong Island LNG project: Mr. A. Muhaimin at Tel No: 98178572, email: muhaimin@pkdbh.com.sg; and Pasir Panjang Terminal project: Mr. Y. Abe at Tel No: 9664 8810, email: y.abe@mypenta.net.

wildfilms note: the dumping area is large and is next to Labrador Nature Reserve, the natural shores of Sentosa at Tanjung Rimau and near Cyrene Reefs.

May 5, 2008

New Fish Farm off Pulau Semakau: MPA Notice

INSTALLATION OF NEW FISH FARM OFF PULAU SEMAKAU
from PORT MARINE NOTICE NO. 95 OF 2008 05 May 2008

With effect from 26 May 08 to 25 Jul 08, off Pulau Semakau.

Tug boat and crane barge will be used to transport materials to the work site. The installation works for the fish farm will be carried out by the crane barge. Tug boat will be used for shifting the crane barge from one point to another. Anchors will be deployed within the working area and their location marked by anchor buoys.

Further enquiries relating to the project can be directed to Mr Erik Vis, the site project manager, at Tel: 9655 3586 or email: erik.vis@barramundiasia.com.


(wildfilms note: here's a photo of the fish farm taken on 3 Aug 08)

Cable laying next to Changi Ferry Terminal: MPA Notice

SUBMARINE CABLE INSTALLATIONS OF AAG CABLE IN THE EAST JOHOR STRAIT
from PORT MARINE NOTICE NO. 96 of 2008 05 May 2008

With effect from 16 May 08 to 15 Jun 08 at East Johor Strait. 24 hours daily, including Sundays and Public Holiday.

The submarine cable installations will entail rock cutting works and cable laying operations. The works will be carried out by the cable laying barges “Cable Protector”.

Further general enquiries relating to the project can be directed to Mr Anthony Wong, the project manager, at Tel: 9755 5573, email: anthony@acpl.com.sg.


Cable starts at Changi Ferry Terminal.

Apr 29, 2008

Works on new Sentosa Bridge: MPA notices

PORT MARINE NOTICE NO. 89 OF 2008 28 Apr 08

Resorts World at Sentosa – Construction of a New Bridge from Singapore Island to Sentosa

With effect from 01 May 08 to 31 Oct 08, at Selat Sengkir.

New bridge construction works will entail steel pipe piling, drilling and socketing of piles and removal of rocks from pile locations. Crane and work barges will be used for the piling works and transportation of equipment. Barges will travel through the Selat Sengkir water to the working area. Barges are expected to travel in/out of the Selat Sengkir water up to 4-6 times a week for material delivery and equipment transportation. A safety boat will be deployed to advise all craft to keep clear of the working area. Further enquires relating to the project can be directed to Mr Chris Kelly, the project manager, at Tel: 9118 2802, email: chris_kelly@macdow.com.au .
from PORT MARINE NOTICE NO. 90 OF 2008 28 Apr 08

Proposed Resorts World at Sentosa: The New Bridge; Widening of the Existing Causeway and
Causeway Extension Works

With effect from 01 May 08 to 31 Oct 08, at Cruise Bay, off Sentosa.

Widening works will entail steel pipe piling and removal of existing revetment. Crane barges and work barges will be used for the piling works and transportation of equipment. A safety boat will be deployed to advise all craft to keep clear of the working area. Further enquires relating to the project can be directed to Mr Chris Kelly, the project manager, at Tel: 9118 2802, email: chris_kelly@macdow.com.au .

Reclamation at Pulau Tekong: MPA notice

MARITIME AND PORT AUTHORITY OF SINGAPORE
from PORT MARINE NOTICE NO. 92 of 2008 29 Apr 08

This is a revision of Port Marine Notice No. 176 of 2007 (extract in this wildfilms post). The working period has been extended. With effect from 29 May 08 to 28 Nov 08, Off Pulau Tekong.

24 hours daily including Sundays and Public Holidays.

Reclamation works at Pulau Tekong will involve dredging, construction of revetment, soil investigation and soil improvement works. Soil improvement works will entail sand piling and deep cement mixing. Trailer-suction-hopper dredgers (TSHD) will be used for transporting and pumping sand into the working area. Safety boats will be deployed in the vicinity to warn other craft of the operations in the area. Further general enquiries relating to the project can be directed to Mr R Kamata, the construction manager, at Tel: 9624 8603, email: ryuji_kamata@tjput.com.sg.


Pulau Tekong is just off Chek Jawa, Pulau Ubin.

Apr 17, 2008

Rock filling near Cyrene with holding area off Labrador Nature Reserve

A) ROCK-FILLING OPERATIONS IN WEST KEPPEL FAIRWAY – SSD3 and SSD4
B) TEMPORARY HOLDING AREA IN WORKING AREA “A” (OFF LABRADOR PARK) (wildfilms comment: MPA should realise that Labrador is now a Nature Reserve)
from PORT MARINE NOTICE No. 84 of 2008 16 April 2008

With effect from 19 Apr 08 to 31 May 08 at West Keppel Fairway, Jong Fairway and approaches to Cruise Bay.
Rock-filling works will be carried out 24 hours daily, including Sundays and public holidays, within the shaded areas of SSD-3 (bounded by Point H,G,I,J) and SSD-4 (bounded by Point J, I, K, L). (wildfilms comment: this is just off Cyrene Reef)Working area “A”, within the shaded areas of “A” (bounded by Point 1 to Point 8) in the vicinity of Labrador Park, has been identified as the temporary holding area for the rock-filling works.Other current on-going works in the area

  • Sand mining and dumping at Labrador Nature Reservemore
  • Labrador Park designated temporary holding area for barge used in rock-filling operationmore
  • Reclamation off Cyrene Reef, Sand mining at Changi more

Apr 8, 2008

Dredging and works at Punggol

DREDGING AND MARINE CONSTRUCTION WORKS AT SUNGEI PUNGGOL, PULAU PUNGGOL BARAT AND PULAU PUNGGOL TIMOR
from PORT MARINE NOTICE NO. 80 of 2008 8 April 2008

With effect from 15 Apr 08 to 14 Oct 08. Sungei Punggol, Pulau Punggol Barat and Pulau Punggol Timor, within the working areas bounded by the shoreline and the following coordinates (see plan attached):Dredging of the riverbed and seabed of Sungei Punggol will be carried out by the grab dredger.
Piling works, reinforced concrete structural works, ancillary works for construction of cofferdam for gate house construction, dam construction and riverbed protection will be carried out across the mouth of Sungei Punggol.

Piers 6 and 5 (partial) of Marina Country Club will be temporarily removed to facilitate the project works. They will be re-instated on completion of project works.

Further enquiries relating to the operation can be directed to Mr. T. Matsumoto, the project engineer at Tel. 9229 6195. (Email: t_matsumoto@shimzcivil.com.sg)

Apr 5, 2008

Sand mining and dumping at Labrador Nature Reserve

Sand mining and dumping to take place just right next to Labrador Nature Reserve ...

SAND MINING AT AREA 1 AND DUMPING AT RECLAMATION OF (i) PASIR PANJANG TERMINAL PROJECT AND (ii) JURONG ISLAND LNG PROJECT
from PORT MARINE NOTICE NO. 78 OF 2008 4 Apr 08

With effect from 10 April 08 to 09 Oct 08. 24 hours daily including Sundays and Public Holidays.

The reclamation works will involve dredging by Trailer-Suction-Hopper-Dredger (TSHD) at Area 1. Area 1 extends from the Singapore Port Limit into the westbound lane of the Traffic Separation Scheme (TSS) within the Singapore Strait.


All dredged materials will be dumped at Pasir Panjang Terminal project (please see Working Area of plan Attached-1) and Jurong Island LNG project (please see Working Area of plan Attached-2).



Further enquiries relating to the project can be directed to the following Project Co-ordinators:

Pasir Panjang Terminal project: Mr. Y. Abe at Tel No: 9664 8810, email: y.abe@mypenta.net;

and

Jurong Island LNG project: Mr. A. Muhaimin at Tel No: 98178572, email: muhaimin@pkdbh.com.sg.